Here is your rough guide, and this assumes no additional works unless stated here:
Under 50m: A day or less
Under 200m: Pencil in two days.
300m+: Three days plus. These jobs often have extra works, such as drainage or earthworks, so guessing from here is just that, guessing. But, lets say a 400m drive with a bit of drainage, leave about 4 days.
The trickier the work, the more difficult the access, the more technical the design, the more difficult the materials are to get (dealing with suppliers can blow all these estimates out of the water), can change everything. So take these as estimates and give us a call if you need an accurate assessment.